Service Area
Deck Builders in High River, Alberta
Arch & Bow builds composite and pressure-treated decks for homeowners in High River, about 40 minutes south of Calgary. Every deck starts with a free 3D design and three options to choose from before anything is built. In High River the first question is not the deck's height but whether the lot sits in the Town's flood hazard area.
Get a Free Design ConsultationYour deck in 20 seconds
Do I need a permit to build a deck in High River?
Yes, if any part of the deck is higher than 0.6m (2 ft) above grade. The Town of High River also requires a building permit when you replace, rebuild or extend a deck that high, replace any of its structural parts, or add stairs to an existing deck. Along with the building permit application, the Town asks for a Siting Confirmation Application, dimensioned plans designed to the National Building Code, 2023 Alberta Edition, a site plan showing the distance from the deck to the property lines, and a list of every contractor and sub-trade, each holding a valid Town of High River business licence. Composite decking needs its CCMC number on the plans. The Town allows at least 15 working days to process a complete application, and permit fees are doubled if construction starts before the permit is issued.
Verified against the Town of High River Unenclosed Deck building permit checklist, checked November 2026.
Can you build a deck in High River's flood hazard area?
Usually not a new one: the Land Use Bylaw allows no new buildings or structures in the Floodway or Restricted Development Area, except to replace an existing building or structure in the same location where the flood hazard can be overcome in a way that is acceptable to the Town and Alberta Environment and Parks. Where the Flood Hazard Overlay and the normal district rules conflict, the overlay takes precedence. That is why we check the Town's Flood Hazard Overlay Map for your lot before any design work starts, so you know what is possible before you fall for a render.
Verified against Town of High River Land Use Bylaw 4594/2021, section 2.2 (Flood Hazard Overlay), checked November 2026.
How far can a deck project into a setback in High River?
In the Traditional Neighbourhood District, an unenclosed deck above 0.6m may project up to 50% into a front or rear setback, and an unenclosed deck below 0.6m is listed among the features that may project into setbacks. Other districts have their own tables, so we confirm your lot's district on the Town's Land Use Bylaw map first.
Verified against Town of High River Land Use Bylaw 4594/2021, section 3.4 (Traditional Neighbourhood District), checked November 2026.
What footings and guards does High River expect on a deck?
The Town's checklist calls for concrete pad footings of at least 24 by 24 by 8 inches under an uncovered deck (36 by 36 by 8 inches under a covered one), at least 4 ft below grade, and engineered drawings for concrete piles without footings or for screw piles. Guards are needed on open sides more than 600mm (24 in) above the ground and must be at least 1.07m (42 in) high, or 0.9m (3 ft) for a single home where the deck surface is no more than 1.8m (6 ft) up. Guard openings must stop a 100mm (4 in) sphere, and nothing on the guard can make it climbable. A deck carrying a hot tub needs an Alberta engineer-stamped design. Building inspections run Monday, Wednesday and Friday, and we book them as part of the job.
Verified against the Town of High River Unenclosed Deck building permit checklist, checked November 2026.
Do you do site visits in High River?
Yes. A High River site visit and estimate is booked the same way as anywhere else we work: send the address through the quote form or call 587-700-3513, we measure the yard in person, then come back with a 3D design and three options to compare before you commit. Fencing the yard too? See our High River fences page.
Ready to build in High River?
See our Calgary deck builders page for materials and process. Everything there applies the same way in High River, only the permit authority, the flood overlay and the setbacks change. Get a free design consultation.