How does an Arch & Bow deck project start?
With a conversation and a site visit. We ask how your family wants to use the yard, which features matter and what the budget is. Then we walk the yard and look at access, grades, existing structures and anything that could limit the design. The aim is to understand how the space should work, not to sell a list of upgrades.
Do I see the deck design before anything is built?
Yes. Every project is designed in 3D first. You review the layout, levels, stairs, privacy, sunlight, seating and lighting, and we make changes at this stage, before materials are ordered or work begins.
What is in the written scope and price?
The exact decking product and colours, framing, railing system, pergola, kitchen components, fire feature, lighting, stairs, demolition, disposal and restoration. If two decking board styles are used to manage cost, the scope shows exactly where each one goes. It also says how GST is handled.
Who handles the deck permit?
We do. We confirm which permits, drawings or engineering your design needs for your municipality, prepare the permit drawings, submit them and coordinate the inspections. Permit and engineering fees are included in our price. Work that needs approval does not start until the approval is in place.
Who arranges utility locates before digging?
We do. Before any excavation or footing work we arrange the utility locate so underground services are found and marked, and digging waits until the locate is complete and valid for the work area.
Who will be working in my yard?
You are introduced to the site supervisor and told which trade crews will be on the job. We use specialist trade crews for different parts of the work. You will know who is supervising day to day, how to reach them, and how any crew change will be communicated.
How is the build scheduled?
Before we start, we agree on the start window, expected duration, delivery plan, access, waste handling and how the yard, the house exterior and the neighbours' properties will be protected.
What happens during footings and framing?
We set out the structure, excavate and install footings to the approved design, and book inspections at the right stages. Nothing is covered or built past an inspection hold point until that inspection has happened. Framing, beams, joists, blocking and stairs are built to the approved drawings and the product's installation requirements, and important stages are photographed before they are concealed.
How are decking, railings, pergolas and features installed?
To the manufacturer's instructions, including joist spacing, fasteners and clearances. Lighting, kitchen and fire feature work is done by appropriately qualified trades, and utility connections and clearances are confirmed before anything is used.
How do I know what is happening each day?
The supervisor runs a morning and an evening checklist and does regular site walkthroughs. These cover site safety, work completed, materials, housekeeping, issues and the plan for the next day. You can ask for a plain-language update and progress photos.
Can the price change after I sign?
Only through a written change order that you approve before the work is done or any cost is added.
How do payments work?
There is a deposit at signing, then payments tied to clearly defined completed stages. The final payment is due only after the final walkthrough, once any deficiencies have been corrected.
What happens at the end of the project?
Required final inspections are completed and signed off. We walk the whole project with you, test the features, list anything incomplete or deficient, and set dates to correct it. You receive the final invoice, permit and inspection records, product information, care instructions and your warranty documents.
What warranty do I get?
A written 2-year Arch & Bow workmanship warranty, separate from the manufacturer's product warranty on the decking, railing and other materials. To make a claim, email info@archandbow.ca with photos of the issue. We reply within 2 business days and book a visit.
Who keeps leftover materials?
You do. Remaining purchased materials and usable cutoffs belong to the homeowner.
Who am I signing the contract with?
Arch and Bow Builders Ltd., operating as Arch & Bow Exteriors. We are the one party responsible to you for all the contracted work, including work done by subcontractors, so you deal with one company. Proof of insurance and WCB coverage is provided before work starts.
Planning a deck?
Arch & Bow Exteriors designs and builds decks, railings and pergolas in Calgary and area. Get a free estimate and tell us how you want to use the yard.
Written by
Iqbal Maan, Founder, Arch & Bow — a design-led deck, fence, railing, pergola, patio and fire pit builder serving Calgary and Airdrie homeowners, launching direct-to-homeowner in December 2026.